Computer Team 2011 Montaña de Luz Post-Trip Documentation Liz Hudak Sam Raudabaugh Jenny Boguski
7 Implementation Plan Date Goals Saturday, March 19 - Arrive at Montaña de Luz in the afternoon - Test and replace cables Sunday, March 20 - Visit to
8 Actual Implementation Date Activities Saturday, March 19 - Arrived at Montaña de Luz in the afternoon - Took a tour of campus - Unpacked materials
9 - Installed Windows 7, recommended drivers, Windows Security Essentials, and Microsoft Office on each laptop - Created desktop shortcuts for releva
10 Objectives Achieved The timeline chronicled on the previous two pages summarizes the objectives that we achieved during our stay in Honduras
11 (1) Updating the Internet System Before leaving for Honduras, we spoke with Brad Doudican, an OSU graduate student who assisted the 2010 and 2011
12 a reliable signal flowed through the cable without interruption (see Figure 6), thus ruling out cable failure as a cause of Internet malfunc
13 Although we had anticipated having extra cable on the spool, we ended up finishing the spool. Cables that we made but did not use are in a labeled
14 An unexpected problem that we encountered during installation was an infestation of ants. Although the computer lab was spared, the access
15 Initially, we believed #1 was the cause. Installing the router in the psychologist‟s office incorrectly (with the router‟s DHCP ser
16 Figure 10. Post-Trip Internet Setup Satellite ModemRouter in Admin OfficeWireless for Admin OfficeLaptops in Admin OfficeEthernet for 3 desksWi
Table of Contents Introduction ...
17 (2) Addressing hardware issues. Our second area of focus involved routine repairs and maintenance in all three buildings. In the computer lab,
18 makeshift bracket from the packing material from one of the EnGenius access points and screws salvaged from a spare computer. This makeshift brac
19 One of the tias (aunts) brought her computer to us to see if we could fix it. The computer was at least 13 years old, judging by the 1998
20 (3) Installing updated software. Before installing any new software, our first step was to backup all relevant data from all computers onto a DVD
21 After these steps were complete, we gave a demonstration of the new operating system and programs, replete with various Microsoft games, to
22 (4) Installing a protective storage cabinet. To combat dust while maintaining security, we assembled and installed a cabinet in the computer lab
23 Sustainability Considerations We addressed sustainability in several ways, both big and small, during and after the trip: We increased computer
24 Recommendations for Future Teams (1) Montaña de Luz is interested in educational software for the children, specifically typing and la
25 Useful Spanish Vocabulary Adapter: el adaptador Attach a file: adjuntar el archive Close: cerrar Computer: la computadora Configuration: la config
26 Computer Team Agreement Team Members Elizabeth Hudak Samuel Raudabaugh Jennifer Boguski Team Project Expectations Have fun.
Think about how you are valuable – not how valuable you are.
27 References Castro, E. (2011, February 1). Email interview. DeYoe, R. (2011, March 2). Personal interview. Doudican, B. (2011, February 9). Persona
28 Appendix A: Cabinet Inventory 4 extra EnGenius Wireless Access Points (2 may be damaged by ants) 4 EnGenius boxes 1 set of Walkie-Talkies
29 Appendix B: Internet and Bandwidth Information What to do in case of slow internet and how to check bandwidth usage Note: This process will tempor
30 Appendix C: IP Address Issues What to do if you get an error on your computer about "IP address already in use on network, IP address in conf
31 Appendix D: What To Do If… As of March 2011, there were an adequate number of spaces in the admin office‟s router for every device. However, if an
32 computers, or another cable can be plugged in and used in the computer lab, which has room for more connections. IF the Internet is not working i
33 Appendix E: How to Resolve an Oversensitive Touchpad The issue seems to be with a touchpad setting called Tapping. Go to Start->Control Pa
1 Introduction For the past six years, Ohio State has been sending service teams to Montaña de Luz, an organization in Honduras that provides compre
2 Problem Definitions We maintained steady email communication with our primary Montaña de Luz contact, Jessica Frisina. She told us that inste
3 Pre-trip Objectives Before arriving in Honduras, we developed a set of four overarching objectives to address the problems outlined above, as also
4 ability to fix the wireless system, we opted to bring down two new EnGenius EOC 26111 access points and store the others as back-ups in case of fai
5 formatting. Before we make these changes, Ms. Frisina is gathering files on each computer for us to save so that no important data is lost. Throug
6 Materials Budget Description Notes Unit Cost Quantity Total Supplier EnGenius EOC 2611 Outdoor wireless access point $76 2 $152 Newegg Custom out