Asus P5BV/SAS Manuel d'utilisateur Page 27

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 184
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 26
ASUS P5BV Series 2-7
3. Lift the load lever in the direction of
the arrow to a 135º angle.
4. Lift the load plate with your thumb
and forenger to a 100º angle (4A),
then push the PnP cap from the
load plate window to remove (4B).
5. Position the CPU over the socket,
making sure that the gold triangle
is on the bottom-left corner of the
socket. The socket alignment key
should t into the CPU notch.
2. Press the load lever with your
thumb (A), then move it to the left
(B) until it is released from the
retention tab.
To prevent damage to the socket pins, do not remove the PnP cap unless you
are installing a CPU.
A
B
Load lever
Retention tab
Load plate
PnP cap
4A
4B
3
Gold
triangle
mark
Alignment key
CPU notch
Vue de la page 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 183 184

Commentaires sur ces manuels

Pas de commentaire